Energy Country Review: Complimentary 7-day trial

  • News-alert sign up
  • Contact us

Nordex Group receives 63 MW order from OX2 in Poland

23/06/2022

The Swedish wind farm developer OX2 has placed an order with the Nordex Group for the supply of eleven N149/5.X turbines for the "Wysoka" wind farm in Poland. The order also includes a Premium Service for the turbines covering a period of 30 years.

The 63 MW "Wysoka" wind farm will be built some 125 kilometres to the south-east of Koszalin in the north-west of Poland. The Nordex Group will supply the N149/5.X turbines on tubular steel towers with hub heights of 125 metres.

Installation of the turbines is due to begin mid-2023 with commissioning following in 2024. OX2 will then take over technical and operational management of the wind farm for the owner, the Ingka Group.

“Wysoka” is the first order from Poland for N149/5.X turbines. With a nominal capacity of 5.7 MW, they are the most powerful wind turbine generators to be used in Poland to date.

KeyFacts Energy Industry Directory: Nordex

Tags:
< Previous Next >