Energy Country Review: Complimentary 7-day trial

  • News-alert sign up
  • Contact us

TechnipFMC awarded Subsea contract for the Lapa Pre-Salt Field in Brazil

09/04/2019

TechnipFMC has been awarded a significant(1) contract for Lapa field by Total E&P do Brasil Ltda., on behalf of the Lapa Field Consortium, comprised of Total (35%), Shell Brasil Petróleo Ltda. (30%), Repsol Sinopec Brasil S.A. (25%) and Petróleo Brasileiro S.A. - Petrobras (10%). The Lapa field is located in the pre-salt Santos Basin, under the BM-S-9A concession, at 2,150 meters of water depth offshore Brazil.

The contract covers the supply of flexible pipes for oil production, gas lift and gas injection as well as associated accessories. The field will be connected to the FPSO(2) Cidade de Caraguatatuba, already in operation.

Arnaud Piéton, President Subsea at TechnipFMC, commented: 
“We are honored to be selected to execute the Lapa pre-salt field project in Brazil. We look forward to collaborating with Total and the Lapa Field Consortium to further enhance the hydrocarbon potential of Brazil.”

(1) For TechnipFMC, a “significant” contract is between $75 million and $250 million. 
(2) FPSO: Floating Production Storage and Offloading unit

KeyFacts Energy: Brazil country page   l   KeyFacts Energy Industry Directory: TechnipFMC

Tags:
< Previous Next >