Energy Country Review: Complimentary 7-day trial

  • News-alert sign up
  • Contact us

Energean Oil & Gas Reports Epsilon First Oil

08/04/2019

Energean Oil and Gas plc announces successful completion of drilling operations of the extended reach well, EA-H3, offshore Greece. The well was brought into production on 1 April and is currently producing at a stable dry oil rate of more than 1,000 bopd on a restricted choke.

The well was drilled to a total measured depth of 5,679 meters and has penetrated 689 meters of the Epsilon sandstone reservoir, in line with pre-drill expectations. Energean will continue to monitor and fine-tune production parameters to ensure optimal production from the well.

The EA-H3 well was drilled using the Company-owned drilling rig, the ‘Energean Force’.

KeyFacts Energy: Greece country page   l   Link to Energean Greece country profile

Tags:
< Previous Next >