Pacific Canbriam Energy has successfully drilled and completed a new record-setting horizontal well in its Altares & Kobes assets in the Montney formation of northeastern British Columbia.

Key Highlights
- The well achieved a measured total depth (TMD) of approximately 8,332 metres, marking the longest well ever drilled in the Montney region.
- The extended-reach horizontal section underscores Pacific Canbriam’s engineering capabilities, efficient drilling execution and commitment to maximize resource recovery while reducing surface disruption.
- This achievement supports the Company’s strategy of deploying longer laterals on fewer pads, thereby increasing subsurface access while reducing the number of surface well sites and associated infrastructure.
- The well was drilled within the Company’s fully-owned infrastructure network, allowing for streamlined operations, lower cost structure and enhanced environmental performance.
“Delivering this milestone well is a tangible demonstration of our capability to deploy advanced drilling techniques in one of North America’s most technically challenging plays,” said Paul Myers, President of Pacific Canbriam. “By pushing the boundaries of lateral reach, we continue to unlock value in the Montney while reducing our surface footprint — a win for our business, for local communities and for the environment.”
“We believe that this well further de-risks our development plan, gives us greater flexibility, and positions the Company to scale responsibly,” added Myers.
Strategic Benefits & Development Implications
- Reduced surface disturbance: Longer laterals from fewer pads mean less land disruption, fewer roads, pipelines and well-site facilities.
- Lower unit cost of access: Each extended-reach well accesses more of the reservoir with similar surface cost bases.
- Sustainability advantage: Aligns with Pacific Canbriam’s commitment to responsible development, as documented in its 2023 Sustainability Report, including its use of multi-well pads, infrastructure ownership and water-recycling initiatives.
- Operational flexibility: With the Company owning the midstream and field infrastructure (gathering pipelines, processing facilities, water handling) the increased lateral length helps optimize throughput and reservoir exposure.
KeyFacts Energy Industry Directory: Pacific Canbriam
KEYFACT Energy