Energy Country Review: Complimentary 7-day trial

  • News-alert sign up
  • Contact us

Beetaloo Completes Carpentaria-5H Hydraulic Stimulation

09/07/2025

Hydraulic stimulation has been successfully completed by Halliburton on Beetaloo Energy’s Carpentaria-5H well in Beetaloo Basin permit EP 187 following a 20-day campaign.

Key Metrics: 

  • Length: 2,955 metres (9,695 feet) 
  • Stages: 67 stages placed o Fluid intensity (avg): 52 bbl/ft – slickwater 
  • Proppant intensity (avg): 2,295 lb/ft – sand 
  • Proppant per stage (avg): 337,000 lbs

Objectives Achieved: 

  • Health and Safety: no recordable or reportable incidents
  • Pump rates: >100 bbl/minute average on multiple stages
  • Design: fully slickwater with various perforation and pump strategies
  • Stages Per Day: first 24-hour stimulation operation for Beetaloo Energy achieving >5 stages per day on multiple days during the campaign
  • Logistics: successful automated conveyor-based wet-proppant delivery providing a pathway for future local sourcing

Beetaloo Energy will now undertake a coiled tubing run to clean out the well bore and initial flow back followed by shut-in for soak until mid-August.

Flow testing will commence following the soak period and IP30 flow rate results are expected by end September.

Beetaloo Energy’s cash at bank is $38.6 million.

KeyFacts Energy: Beetaloo Australia country profile

Tags:
< Previous Next >