Energy Country Review: Complimentary 7-day trial

  • News-alert sign up
  • Contact us

Condor Provides Update on Operations in Uzbekistan and Kazakhstan

19/06/2025

Condor Energies, a Canadian based, internationally focused energy transition company with active operations in Central Asia today provides an update on operations in Uzbekistan and Kazakhstan.

UZBEKISTAN

Production for June has averaged 11,350 boepd to date which is slightly above the first quarter of 2025 average of 11,179 boepd. Production rates in the second quarter of 2025 have been partially restricted due to unplanned downstream infrastructure maintenance at non-Company operated facilities and recent workovers that were focused on data gathering to enhance geologic and reservoir modeling for the upcoming drilling campaign. The resulting second quarter production to-date is 10,332 boepd. Well workover activities have since returned to production-add opportunities and the downstream facilities are fully operational.

A drilling rig is scheduled to mobilize in July 2025 and begin a multi-well drilling campaign that will target numerous play types within a diverse prospect inventory. A combination of vertical, horizontal and Uzbekistan’s first multi-lateral wells will penetrate under-developed reservoirs in the existing fields. In addition to penetrating the currently producing Jurassic Carbonates, the first well will be a vertical well drilled to the basement rocks to evaluate the deeper under-explored Jurassic Clastics and the potential for a fractured basement play type. The second well is intended to be a horizontal well with up to a 1500-meter lateral section. Wells are planned to be completed with modern stimulation techniques to further increase production rates.

The Company has also installed and commissioned four in-field flowline water separation systems to remove produced fluids at the field gathering network rather than at the production facilities. This reduces flowline pressure that can lead to higher reservoir flow rates. A fifth in-field flowline unit is being installed and expected to be commissioned in early July 2025. Engineering design work is also ongoing for field compression that could further boost production rates.

KAZAKHSTAN

Condor has purchased its first modular LNG facility which is capable of producing 48,000 gallons (80 MT) of LNG per day. Fabrication of the First Facility is on track to be completed in the fourth quarter of 2025 and begin LNG production in the second quarter of 2026. The LNG off-taker agreement is expected to be executed shortly.

KeyFacts Energy: Condor Petroleum Uzbekistan country profile   l   Kazakhstan country profile

Tags:
< Previous Next >