Energy Country Review: Complimentary 7-day trial

  • News-alert sign up
  • Contact us

Po Valley Announces Resource Upgrade

19/02/2018

Po Valley Energy Limited reports an upgrade of its oil and gas reserves and resources for its 100% owned subsidiary Po Valley Operations Pty Ltd (“PVO”) as part of the release of an extensive Competent Persons Report (“CPR”) prepared on PVO, Po Valleys 50% owned Saffron Energy Plc  and Appenine Energy.

Maiden 2P Reserves of 36.5 bcf of gas have now been declared at the Company’s offshore Adriatic development Teodorico gas field in line with the Society of Petroleum Engineers (“SPE”) guidelines.

Teodorico has the largest gas in place of all of Po Valley’s gas fields and is at an advanced stage of assessment and is ready for development. The Company received a preliminary award of the Teodorico Production Concession last year and is advanced in securing environmental approval which is the main step before full grant of the Production Concession.

The development of the Teodorico gas field involves the drilling of two wells, Teodorico1 (TD MD 1,880 metres) and Teodorico2 (TD MD 1,900 metres) both drilled in shallow water (about 30m depth) and the construction of a 12km tie line to the ENI operated Naomi Pandora gas processing facility which is connected to the Italian National Grid.

Close to one million Euros has already been spent by Po Valley on technical and facilities studies in order to reach this stage and all relevant permits are in hand. The Environmental Impact Assessment has been successfully filed and accepted by Governmental Authorities and Po Valley’s formal development plan has been fully sanctioned by the Italian Ministry. Costs have been scoped and quotes obtained for Capex planning, covering the whole execution process.

The competent person, CGG Services (UK) Limited (CCG), considers that having reached this advanced stage, and having made these commitments, it is now reasonable to expect that the Operator will proceed to development within five years.

As indicated in January, following the successful drilling of Podere Maiar 1 dir well in the former Selva gas field in the Podere Gallina exploration licence, work is underway to provide updated reserve and resource estimates on the Selva Stratigraphic discovery and Po Valley plans to update the market on these in the second quarter 2018 when completed and signed off by the competent person.  The Contingent Resources estimates have been adjusted to reflect Po Valley’s 63% share in the licence and gas field following the successful farm out to United Oil and Gas Plc and to Prospex Energy Plc.

The report by CGG, has been prepared in connection with the proposed acquisition of PVO and Sound Energy Holdings Italy Limited by Saffron and the readmission to AIM of the enlarged group, subject to shareholder approval. Saffron published its admission document on 16 February 2018 after close of the ASX trading. The Po Valley Board is currently awaiting finalisation of an Independent Experts Report on the proposed transaction[1], as required by ASX Listing Rule 10.10.2, as part of their evaluation of the proposed transaction and will provide further advice on this to the market as soon as practical.ed to development within five years.

Tags:
< Previous Next >