C&C Reservoirs’ latest content release highlights 47 new and rewritten Reservoir Evaluation Reports from across the globe.
Release Highlights:
Barracuda (Offshore Brazil) – Onstream since 1997, the main reservoir, Upper Oligocene Marlim-10, has a STOIIP of 1679 MMBO and an EUR of 397 MMBO for a recovery factor of 23.6%. Production was by continuous water injection aided by gas lift and mostly through horizontal wells.
Mampntovo Field (Russia) - New report - This field was discovered in 1965 and began production in 1970 from the main BC10 reservoir (8.5 BBO STOIIP and 3.9 BBO EUR, 46% recovery factor). By 2015, the BC10 reservoir had produced 3.4 BBO.
North Field-South Pars Field (Iran-Qatar) - The largest single gas accumulation in the world containing a GIIP of ~1800 TCF, CIIP of 50 BBC with EUR of 1260 TCF in a 9700 km2 domal anticline, split between the North Field in Qatar and the South Pars Field in Iran. Cumulative production currently stands at 200 TCF.
Patujusal (Bolivia) - Onstream since 1993, the field has a STOIIP of 53.8 MMBO and an EUR of 9.2 MMBO for a 17% recovery factor. Production is mainly by aquifer drive aided by waterflooding, horizontal drilling, and gas lift.
P18 (Offshore Netherlands) - New report - The P18 gas field in the West Netherlands Basin ceased production in 2022 after having produced a cumulative 486 BCF with a recovery factor of 97%. In 2013 a CO2 storage permit was issued and the field could potentially store 40 MMt.
Sukowati Field (Indonesia) - New report - S. A 700 ft oil column with a STOIIP of 308 MMBO and EUR of 157 MMBO (51% recovery factor) is trapped in an isolated, 2000 ft-high carbonate buildup. By 2019, cumulative production had reached 123 MMBO.
KeyFacts Energy news: Products & Services l KeyFacts Energy Industry Directory: C&C Reservoirs