Energy Country Review: Complimentary 7-day trial

  • News-alert sign up
  • Contact us

TechnipFMC Secures Contract for AKER BP’s Utsira High Development

01/02/2023

TechnipFMC has been awarded a large(1) integrated Engineering, Procurement, Construction, and Installation (iEPCI™) contract by Aker BP (OSE: AKRBP) for its Utsira High development.

The contract brings together three projects that will tie back to the Ivar Aasen and Edvard Grieg production platforms. TechnipFMC will engineer, procure, construct, and install the subsea production systems, controls, pipelines, and umblicals for the development, which is Aker BP’s first iEPCI™ project. It follows a two-year integrated front-end engineering and design (iFEED™) study to optimize field layout.

Jonathan Landes, President, Subsea at TechnipFMC, commented: 
“Aker BP is joining the growing list of clients who are choosing the benefits of our integrated model, which include an acceleration in time to first production. Our familiarity with the Utsira High area and the success of our installed base there were key components in receiving this direct award. We have valued our dialogue with Aker BP during this process and we are excited about collaborating with them on Utsira High.”

(1) For TechnipFMC, a “large” contract is between $500 million and $1 billion.

KeyFacts Energy Industry Directory: TechnipFMC

Tags:
< Previous Next >